A pricing framework for renovation contractors that captures every real cost, protects your margin, and reads professionally to homeowners. Line item breakdowns, markup rates by trade, contingency math, and the pricing mistakes that lose 30 percent of margin.

HR
Hello Renovate team
Jul 10, 2026 · 13 min read

Every renovation contractor eventually learns the pricing lesson the hard way. You quote a job at what feels like a fair number, execute the work, and at project end you realize you made 8 percent net when you needed 20. That gap between what you quoted and what you should have quoted is the single biggest killer of contracting shops. This playbook is the pricing framework that keeps every kitchen remodel margin healthy.

The pricing framework in one sentence

Direct cost, plus trade markup, plus overhead, plus contingency, equals customer facing price. Every quote follows this framework. Every deviation from this framework is a place margin leaks.

The formula

Direct cost (materials + labor + subs)
+ Trade markup per line item
+ Overhead 10 to 15 percent
+ Contingency 10 to 25 percent (sized to project risk)
= Customer facing price

Line items and rates

Do not price from scratch on every quote. Build a template with the typical kitchen remodel scope items and update rates quarterly. Line items are the difference between a professional quote and an amateur quote.

Standard kitchen quote line items

  1. Demo and haul away
  2. Structural work (if applicable)
  3. Plumbing rough in (with permit fee separate)
  4. Electrical rough in (with permit fee separate)
  5. HVAC modifications (if applicable)
  6. Insulation and drywall
  7. Flooring underlayment and finish
  8. Cabinet supply and install
  9. Countertop template, fabrication, install
  10. Backsplash tile supply and install
  11. Appliances (with delivery and install)
  12. Plumbing fixtures (faucet, sink, disposal, dishwasher supply lines)
  13. Electrical fixtures (lighting, outlets, switches)
  14. Paint (walls, trim, ceiling)
  15. Trim carpentry
  16. Permits and inspections
  17. Overhead (as a percentage line item)
  18. Contingency (as a percentage line item)

Markup by trade

Different line items carry different markups. Materials sold at every hardware store carry lower markup than specialty items. Direct labor carries higher markup than subcontracted labor.

Cabinets and casework

20 to 30 percent markup

Semi custom cabinets are the largest single line. Carry a healthy markup because you handle warranty and installation coordination.

Countertops (quartz, granite)

20 to 30 percent markup

Fabricator gives you a wholesale price. Markup covers template coordination, install coordination, and templating error risk.

Appliances

5 to 15 percent markup

Low markup because homeowners can price shop. Still worth carrying so you handle delivery, install coordination, and warranty for them.

Labor (direct crew or self)

40 to 60 percent markup

Fully burdened labor rate (including benefits, taxes) times 1.4 to 1.6. This is where you make your money.

Subcontractor work (plumbing, electrical)

10 to 20 percent markup

The sub already marks up their materials and labor. Your markup covers coordination, quality checks, and payment handling.

Materials (tile, flooring, hardware, paint)

15 to 30 percent markup

Depends on volume. Higher volume you can carry lower markup. Specialty items always carry higher.

Contingency math

Contingency is not padding. It is a reserve for unknown site conditions revealed during demo. Explaining this in the quote is the difference between a customer who trusts contingency and a customer who tries to negotiate it away.

Low risk (10 to 15 percent contingency)

  • House built 1990 or later
  • No structural changes
  • Existing plumbing and electrical stays in place
  • No moisture history

High risk (20 to 25 percent contingency)

  • House built pre-1980 (electrical, cast iron drains, asbestos)
  • Any structural change (load bearing wall, header install)
  • Moving plumbing fixtures
  • Prior water damage or moisture history

6 pricing mistakes that lose 30 percent margin

The mistakes almost every contractor makes at least once. Learn from these instead of paying the tuition yourself.

Quoting a flat total on a project scope you have never built before. Under 3 kitchens on the same layout, always use line item cost plus.

Zero markup on materials. Ties up your capital and eats the waste. Minimum 15 percent even on volume items.

Under quoting labor at market rate instead of your rate. A 5 person crew's rate is higher than a solo contractor's rate because of overhead and management burden.

Skipping contingency to hit a competing bid. If the customer chose you for price alone, they will not choose you for the change orders you will need to file.

Verbal only change orders. Every change is a signed change order document with pricing. No exceptions.

Presenting quotes as PDFs of Word documents. Modern tools with online accept + milestone billing schedule read 15 to 30 percent more professionally and close faster.

Presenting the quote

The tool matters more than most contractors think. A branded quote with line items, a milestone billing schedule, and a one click accept button closes 15 to 30 percent faster than the same numbers in a Word document PDF.

1

Build a line item template with quantities and rates

Save reusable service catalog items for common work if they fit your process. Verify quantities, scope, and supplier rates for each project and update catalog costs when they change.

2

Calculate direct costs at supplier pricing

Cabinets at your supplier discount. Countertops at your fabricator price. Labor at fully burdened crew cost (with benefits and taxes). Never quote at retail. You have no room to negotiate down.

3

Apply per line item markup

Materials 15 to 30 percent. Labor 30 to 60 percent. Subs 10 to 20 percent (they are already marked up by the sub). Add trade specific expertise for high risk work (structural, gas, HVAC).

4

Add overhead as a percentage

10 to 15 percent overhead line item covers rent, insurance, tools, vehicles, back office. This is separate from job direct costs.

5

Add contingency, sized to project risk

10 to 15 percent for new construction or houses with recent renovations. 20 to 25 percent for older houses or any structural work. Explain what contingency is in the quote so the customer does not think it is padding.

6

Round the total for professionalism

$47,283.46 reads as either amateur or dishonest. Round to $47,500. Homeowners trust round numbers.

7

Present with a milestone billing schedule

Every quote includes the milestone schedule that will bill it (deposit, demo, rough in, cabinets, punch). Clients that see the schedule accept 20 to 30 percent faster than clients staring at a single total.

Frequently asked questions

How should I price a kitchen remodel?

Start with direct costs (materials, labor, subcontractors), then account for overhead, risk, taxes, and desired profit using a method that fits your business. Percentages vary by market, project, and contract; use your records and supplier quotes rather than treating a generic markup as a rule.

What markup should I add on materials?

There is no single material markup that fits every business. Account for purchasing time, handling, delivery, waste, warranty obligations, taxes, and market conditions, and make the pricing method clear in your estimate.

What markup on labor?

Calculate fully burdened labor cost, including applicable payroll costs, benefits, and non-billable time. Add overhead and profit according to your cost structure and market; a universal labor markup can misstate your actual margin.

What is a fair contingency?

Contingency depends on the uncertainty and contract. Identify likely unknowns, explain how additional work will be approved and priced, and document whether unused allowances are credited or handled another way.

How do I quote change orders?

Every change order is a mini estimate. Line items, materials with markup, labor with markup, and a schedule impact statement. Signed by both parties before work proceeds. Verbal only change orders are the single biggest reason contractors end up in disputes with clients.

Should I include a full breakdown or just a total?

A clear breakdown can help a client understand scope and price. Choose a level of detail that explains the work, assumptions, and exclusions without creating misleading precision; no single format suits every client.

How much profit should I make on a kitchen remodel?

Profit targets vary by business model, project risk, overhead, and local competition. Calculate expected net profit using your own costs and actual results; a percentage benchmark cannot tell you whether a particular quote is viable.

Should I mention Hello Renovate in my quotes?

Hello Renovate provides branded estimates with online acceptance and milestone invoicing. A clear proposal can support the client conversation, but we do not have evidence to claim it increases close rates by a specific amount.

Are you a contractor?

Run your renovation business with Hello Renovate. Add your own kitchen services, costs, and prices to the catalog, then create a project-specific estimate with line items, terms, and milestone payment stages, client approval included.

Sign up
HR
Written by the Hello Renovate team

Built with renovation contractors, for renovation contractors.